CH200 / CH200/200

Features Twin cage capability High speed (63m/min) Energy efficient VFC Advantages Doubles vertical traffic capacity on a single mast Rapid vertical travel Low starting current Benefits Logistics Throughput: Handles peak shift changes and material deliveries simultaneously Efficiency: Minimizes transit time to upper floors Cost Reduction: Lowers site energy consumption Product Details Safety Device If the descending speed of the hoist exceeds the rated speed, the device will automatically lock and the hoist will stop immediately. The power to the hoist is cut off. Tie-in The tie-in is a key supporting component that anchors the hoist to the building structure, restrains tower sway, transfers lateral loads, and ensures safe and stable vertical lifting of the equipment. Drive Unit The gear motor of the construction hoist drives the pinion to move up and down along the rack. This allows the rollers to travel up and down the mast. Mast Section The mast section is a primary load-bearing structural component that forms the main body of the hoist, provides vertical guidance for lifting, can be extended by adding sections as needed, and supports the weight of both equipment and personnel. Rack and Pinion Drive A forced drive system. Variable-frequency Drive (VFD) Unit The construction hoist is equipped with a VFD unit, allowing control of key features such as hoist control logics and smart voice module.The car features smooth start and stop operation, enhancing ride comfort for passengers.

Model CH200 (Single) CH200/200 (Twin) Rated Load 2000 kg 2000 / 2000 kg Speed 0-46 m/min or 0-63 m/min 0-46 m/min or 0-63 m/min Control System VFC VFC Motor Power 2x11 / 2x18.5 / 3x11 / 3x18.5 kW 2x (2x11) / 2x (3x18.5) kW Cage Dimensions 3200 x 1500 x 2200 mm 3200 x 1500 x 2200 mm Max Height 300 m 300 m

CH200 / CH200/200

CH200 / CH200/200
CH200 / CH200/200
CH200 / CH200/200
CH200 / CH200/200
3S Industry
Select Quantity
1

CH200 / CH200/200

3S Industry
Select Quantity
1

Features

  • Twin cage capability

  • High speed (63m/min)

  • Energy efficient VFC

Advantages

  • Doubles vertical traffic capacity on a single mast

  • Rapid vertical travel

  • Low starting current

Benefits

  • Logistics Throughput: Handles peak shift changes and material deliveries simultaneously

  • Efficiency: Minimizes transit time to upper floors

  • Cost Reduction: Lowers site energy consumption

 

Product Details

Safety Device

If the descending speed of the hoist exceeds the rated speed, the device will automatically lock and the hoist will stop immediately. The power to the hoist is cut off.

µب╕ف┐âلâذغ╗╢-Safety-Device.png

Tie-in

The tie-in is a key supporting component that anchors the hoist to the building structure, restrains tower sway, transfers lateral loads, and ensures safe and stable vertical lifting of the equipment.

µب╕ف┐âلâذغ╗╢-Tie-in.jpg

 

Drive Unit

The gear motor of the construction hoist drives the pinion to move up and down along the rack. This allows the rollers to travel up and down the mast.

 

µب╕ف┐âلâذغ╗╢-Drive-Unit.png

Mast Section

The mast section is a primary load-bearing structural component that forms the main body of the hoist, provides vertical guidance for lifting, can be extended by adding sections as needed, and supports the weight of both equipment and personnel.

µب╕ف┐âلâذغ╗╢-Mast-Section.png

Rack and Pinion Drive

A forced drive system.

Rack-and-Pinion-Drive.png

Variable-frequency Drive (VFD) Unit

The construction hoist is equipped with a VFD unit, allowing control of key features such as hoist control logics and smart voice module.The car features smooth start and stop operation, enhancing ride comfort for passengers.

Variable-frequency-Drive-VFD-Unit.png

Model CH200 (Single) CH200/200 (Twin)
Rated Load 2000 kg 2000 / 2000 kg
Speed 0-46 m/min or 0-63 m/min 0-46 m/min or 0-63 m/min
Control System VFC VFC
Motor Power 2x11 / 2x18.5 / 3x11 / 3x18.5 kW 2x (2x11) / 2x (3x18.5) kW
Cage Dimensions 3200 x 1500 x 2200 mm 3200 x 1500 x 2200 mm
Max Height 300 m 300 m